Most failing programmes are not failing for the reason the steering committee thinks. By the time recovery is on the agenda, the reporting has usually been optimistic for months, the delivery plan has quietly detached from reality, and the people who could tell you what is actually happening have stopped saying so.

We stabilise the programme in 30 days, then rebuild it so it delivers.

When boards call us

You are probably here because one or more of these is true. If you are still unsure whether the situation warrants intervention, our guide on when to initiate project recovery covers the indicators in more detail.

  • The programme has missed two or more major milestones and the recovery plan keeps slipping.
  • Reported status is green but delivery evidence does not support it.
  • The systems integrator and the internal team are in dispute about scope.
  • Spend to date is significant and nobody can tell you what proportion is earned value.
  • A go-live date has been committed externally, to a regulator, a lender, or the market.
  • The programme director has left, or is about to.

How programme recovery works at Intology

Recovery is not a review. A review produces a document. Recovery produces a programme that delivers.

Days 1 to 10 - Diagnose

We establish what is actually true. That means direct access to the delivery team rather than the reporting line, a full read of the artefacts that show real progress including test results, defect trends, environment readiness and data migration status, and honest conversations with the people who have been carrying the risk. You get a written position on root cause, earned value, and the realistic range of outcomes. Not a RAG chart. Our approach to the programme health check phase is set out in full for those who want to understand the methodology.

Days 11 to 20 - Stabilise

We stop the bleeding. Scope is frozen, the critical path is re-established, and governance is cut back to decisions that actually need making. Where leadership gaps are the root cause, we fill them directly rather than advising someone else to. For a full breakdown of the practical steps involved, see our guide to the eight essential steps to rescue a troubled project.

Days 21 to 30 - Re-baseline

You get a plan you can defend to your board, your investors, or your regulator. Re-baselining is where most recovery attempts fail, because the new plan is built on the same optimism as the old one. Ours is built on measured delivery velocity from the diagnosis phase.

Beyond day 30 - Embed

This is where we differ from most recovery firms. Under the Embedded Change Model, capability transfers to your team as we go. We are not building a dependency. The exit is designed from week one.

What makes this different

We are vendor-neutral by construction

We do not implement software, we do not resell licences, and we take no commission from any systems integrator or vendor. When we tell you the systems integrator is the problem, or that the systems integrator is not the problem, there is no commercial reason for us to say either.

You get the people you met

Intology is deliberately small. The person who runs your diagnosis is the person who runs your recovery. There is no pyramid, and no handover to a delivery team you have not met.

We take accountability, not just a position

Recovery frequently requires someone to hold a programme leadership role while the permanent structure is rebuilt. We do that. Advisory-only recovery rarely works, because the hardest part is not knowing what to do, it is having the standing to make it happen.

Where we do this work

Programme recovery across ERP and finance transformation, core banking, utilities and regulated infrastructure, retail and supply chain, facilities management, and public sector delivery. This includes IT programme recovery across financial services, retail and the public sector. Client base spans private equity portfolio companies, FTSE-listed groups, and mid-market businesses across the UK and Europe. Where the programme in difficulty is an AI or data initiative, we cover that as a separate specialism through our AI programme recovery practice.

FAQ

Frequently asked questions

How quickly can you start?+

Usually within a week. Diagnosis does not require a lengthy mobilisation, and delaying the start of a recovery is almost always more expensive than the recovery.

Do we have to stop the programme while you assess it?+

No. Stopping a programme to diagnose it destroys momentum and morale, and it is rarely necessary. We work alongside live delivery.

Will you replace our systems integrator?+

Only if that is genuinely the right answer, and it usually is not. Replacing a systems integrator mid-programme resets the clock and is very expensive. More often the problem is the contract, the governance, or the client-side capability to manage them.

What if the honest answer is that the programme should be stopped?+

Then we will tell you that, in writing, with the analysis behind it. Being willing to recommend cancellation is part of what makes the rest of our advice worth anything.

How much does programme recovery cost?+

It depends on the size of the programme and whether we are advising or holding delivery accountability. We will give you a fixed price for the 30-day diagnosis and stabilisation before you commit to anything beyond it.

Who will actually do the work?+

Programme recovery at Intology is led personally by Richard Keenlyside, Founder and CIO, who has run and recovered large transformation programmes across retail, banking, utilities and the public sector.

What happens at the end?+

Either we hand back to a strengthened internal team, or we continue running delivery until the programme lands. That choice is yours and it is not made at the start.

Talk to us about your programme

If you are weighing up whether a programme needs recovery, that question is usually its own answer. A conversation costs nothing and will tell you quickly whether this is something we can help with.